Market Survey Honolulu ATC Reroof
Agency: | TRANSPORTATION, DEPARTMENT OF |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159155451561183 |
Posted Date: | Oct 27, 2022 |
Due Date: | Nov 3, 2022 |
Solicitation No: | 697DCK-23-R-Honolulureroof |
Source: | https://sam.gov/opp/a9bd45da2b... |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Sources Sought (Original)
- All Dates/Times are: (UTC-07:00) PACIFIC STANDARD TIME, LOS ANGELES, USA
- Original Published Date: Oct 27, 2022 12:05 pm PDT
- Original Response Date: Nov 03, 2022 04:00 pm PDT
- Inactive Policy: 15 days after response date
- Original Inactive Date:
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z1BC - MAINTENANCE OF RADAR AND NAVIGATIONAL FACILITIES
-
NAICS Code:
- 238160 - Roofing Contractors
-
Place of Performance:
Honolulu , HI 96818USA
The FAA is conducting this Market Survey to determine the level of interest in the subject project. Please respond with interest to Darren.odegard@faa.gov No contract of any kind will be a result of this announcement.
Project value is in excess of $1 million
Summary of Work
All quantities noted in this summary are approximate, for indication of magnitude only.
1. New cover-board and fully-adhered PVC roofing system over the existing Base Building low-slope roofing. Approximately 69,000 square feet of roof, with approximately 1900 linear feet of existing low parapets.
2. Restoration of any temporarily displaced lightning protect system elements on the roofs and parapets to their pre-roofing-work locations and conditions.
3. Replacement of the Base Building Cafeteria Canopy standing-seam metal roofing and metal gutters. (Note: the existing Cafeteria Canopy gutters are corroded through, and replacement of the metal roofing is required to replace the gutters.) Approximately 2460 square feet of metal roofing, with approximately 290 linear feet of gutters.
4. Renovation of the corroded bottom of tubular-steel columns at the Cafeteria Canopy (two columns only). This work consists of core drilling work-access holes through existing pre-cast concrete column surrounds, removing existing corrosion at the bottom of the steel columns and applying new corrosion resistant coating, grouting around the bottom of the steel columns, and patching the work-access holes.
5. Renovation of the metal gutters at the other Base Building canopies. Approximately 510 linear feet of gutters.
6. New safety walkways at metal roofing interior gutters. Approximately 130 linear feet of walkways.
7. Replacement of the ATCT (Airport Traffic Control Tower) Cab exterior wall sealant.
8. Replacement of the ATCT Catwalk access hatch, replacement of the ladder up to the hatch, and providing new hatch safety gate. Ladder height approximately 11 feet.
9. Waterproofing deck coating on the ATCT Catwalk. Approximately 440 square feet.
10. Waterproofing deck coating on the ATCT 2nd Floor. Approximately 360 square feet.
11. Other Work indicated in the Contract Documents.
- AAQ-500, FAA SW REGIONAL OFFICE 10101 HILLWOOD PKWY
- FORT WORTH , TX 76177
- USA
- Darren Odegard
- darren.odegard@faa.gov
- Phone Number 2062313022
- Oct 27, 2022 12:05 pm PDTSources Sought (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.